Adams Master Bath

Project Year: 2018
Project Cost: $25,001 – $50,000

Project Type: Bathroom Renovation

About this Project

My client was tired of the builder master bath they have used for years. We completely gutted this bathroom and enlarged the tub area for a new larger Kohler whirlpool tub, new larger shower/seat with dual controls and large custom niche, frameless glass, James Martin furniture vanity and beautiful new barn door. Along with the barn lights and mini barn door mirrors this project turned out incredible. I made the shower curb-less for easy entry, installed the mixing valve on the half wall so no need to enter shower to turn water on with this oversized shower. I installed a large bench and wall niche for all their products. I heated the floor, installed a bidet seat, pocket door so no door swing in the way and installed all marble in this bathroom to finish it off for my very deserving customer.